Pontus Pack
Engineering

Packaging engineering that treats every claim as something you can test

From design-for-manufacture through finite element analysis, physical prototyping and validated testing — our engineering process exists to catch failure in the lab, not in your supply chain.

Our Process

A design-build-test cycle, not a single design pass

Every packaging program moves through the same engineered sequence — component assessment, DFM, prototyping, simulation, physical testing, validation sign-off and production release — with continuous improvement feeding data back into the next cycle.

1

Assess

Component geometry, weight & risk

2

DFM

Design for manufacture

3

Prototype

Physical build for fit checks

4

Simulate

FEA & stacking simulation

5

Test

Drop, ISTA & road testing

6

Validate

Sign-off against protocol

7

Release

Production tooling & rollout

Continuous Improvement — field and warehouse data feeds back into the next design cycle

Capabilities

Nine engineering capabilities

Design for Manufacture (DFM)

Structural and material design reviewed for manufacturability before tooling is committed, reducing rework and cost surprises downstream.

Finite Element Analysis

Digital stress and load modeling predicts packaging performance under compression and impact before a physical prototype is built.

Stacking Simulation

Warehouse and container stacking loads modeled against packaging structural limits to prevent crush failure in storage or transit.

Packaging Validation

Formal validation against ISTA, ASTM D4169 or customer-specific protocols, with documented pass/fail evidence.

Drop Testing

Controlled-height drop testing across package orientations to identify impact failure points before production.

ISTA Testing

International Safe Transit Association test sequences applied for standardized, comparable performance benchmarking.

Road Testing

Instrumented road and real-route testing capturing the actual shock and vibration profile of your transit lane.

Prototype Development

Rapid physical prototyping from design concepts, built and iterated in our in-house design center.

Continuous Improvement

Field and warehouse damage data reviewed on a cycle to refine packaging specifications over the product's life.

Why It Matters

A failed drop test in our lab costs a design iteration. A failed drop in the field costs a lot more.

Validation testing before production tooling turns an expensive field failure into a cheap lab iteration. Every test report we issue documents the exact protocol, conditions and pass/fail determination — evidence your quality and procurement teams can actually audit.

What a validation report includes

  • — Exact test protocol and severity level applied
  • — Documented test conditions and sequence
  • — Photographic / video evidence of the test run
  • — Clear pass/fail determination against defined criteria
  • — Design recommendations where performance falls short

Have a packaging challenge that needs an engineered answer?

Share your component data, target industry and transit route — our packaging engineers will respond with a specification, not a generic quote.

CallContact Us